Villawood Properties Facebook Facebook Instagram Twitter YouTube Linked In Linked In Email Phone Phone Next Scroll to move Touch to move edit edit Play Play Pause Volume Mute Zoom Search Map Map List Social New Application Document Request User Lot Area Frontage Depth Bedrooms Bathrooms Garage Price Range Download Location Location Filter Bedrooms Bathrooms Bathrooms Lot Size Stage Sales Sales Titled Lot Lot Club Access Visitors Virtual Tour Open Close

Construction Update

Stage 5

22%
Overall Progress
Loading
80%
Phase 1

Planning & Engineering Approvals

Once the Development Approval has been issued by Council, stage specific plans, including roads and drainage, sewer and water, electrical, telecommunication and landscaping plans, are lodged for approval with the relevant authorities.

75%
Phase 2

Earthworks and Retaining Walls.

Machinery is brought onto site to strip existing topsoil and start shaping the land to ensure that the required levels are met for road and lot construction. This usually includes cutting and filling various areas within the stage, to meet required design levels and the construction of retaining walls.

Tip: Start your journey with a Villawood Builder Partner and find your future home
0%
Phase 3

Sewerage, Drainage and Water Reticulation

Trenches are excavated for the installation of underground services, which are usually delivered in order of sewer, drainage and water. The sewerage and drainage network is controlled by gravity, which is why they are often the deepest assets and are delivered first.

0%
Phase 4

Road Base, Kerbs, Electrical & Fibre

Further underground services are installed including electricity and telecommunications (fibre internet). Road construction takes place over several phases. Excavation and preparation of the base layer commences first and is often followed by installation of various conduit crossings and kerb construction.

0%
Phase 5

Footpaths, Road Pavement, Asphalting and Landscaping

Construction of the road continues, with numerous road layers completed through to the final asphalt layer. The stage starts to look like your future community, with driveways, footpaths, nature strips created and street trees planted.

0%
Phase 6

Compliance & Plan Sealing

Each stage is closely inspected and audited by Council to ensure the new infrastructure complies with the plans and relevant standards. Once council's compliance department accepts the works, a plan sealing application is lodged to the local authority for assessment and approval.

0%
Phase 7

Titles and Settlements

Once the survey plan is sealed and endorsed by the local authority, this plan and all other relevant documentation is lodged with Titles Queensland lodgment for individual titles for each lot to be issued. Your solicitor or finance broker is notified when this has occurred and will arrange for settlement.

Loading...
Loading...
Loading...
Loading...
Loading...