Villawood Properties Facebook Facebook Instagram Twitter YouTube Linked In Linked In Email Phone Phone Next Scroll to move Touch to move edit edit Play Play Pause Volume Mute Zoom Search Map Map List Social New Application Document Request User Lot Area Frontage Depth Bedrooms Bathrooms Garage Price Range Download Location Location Filter Bedrooms Bathrooms Bathrooms Lot Size Stage Sales Sales Titled Lot Lot Club Access Visitors Virtual Tour Open Close

Construction Update

Stage 1 | Stage 1 Titles Expected in May 2025

Valuations: Nov 24   |   Estimated Access For Soil Testing: May 25   |   Site Survey: May 25   |   Estimated Title Dates: May 25   |   Settlements Commencement: Jun 25

67%
Overall Progress
Loading
100%
Phase 1

Planning & Engineering Approvals

Development Approval has been issued by Council. Stage specific plans, including roads, stormwater, wastewater, water, electrical, telecommunication and landscaping plans, have been approved by the relevant authorities.

100%
Phase 2

Earthworks

Machinery has stripped existing topsoil and shaped the land to meet the required levels for road and lot construction. This included cutting and filling various areas within the stage to meet required design levels. Earthworks for Stage 1 are largely complete.

Tip: Start your journey with a Villawood Builder Partner and find your future home
100%
Phase 3

Sewerage, Drainage, Water & Gas Reticulation

Service infrastructure is well under construction and nearing completion, with wastewater, stormwater and water infrastructure installed. The wastewater and stormwater network is controlled by gravity, which is why they are often the deepest assets and are delivered first.

100%
Phase 4

Road Base, Kerbs, Electrical & Fibre

Further underground services are installed including electricity and telecommunications (fibre internet). Road construction takes place over several phases. Excavation and preparation of the base layer commences first and is often followed by installation of various conduit crossings and kerb construction, which are now nearing completion

75%
Phase 5

Footpaths, Road Pavement & Asphalting

Construction of the road continues, with numerous road layers completed through to the final asphalt layer. The project starts to look like your future community at this stage, with driveways, footpaths and nature strips created in preparation for landscaping. Work in preparation for footpaths has commenced.

  • Stage 1 Phase 5
0%
Phase 6

Completions & Inspections

Each stage is closely inspected and audited by various authorities to ensure the new infrastructure complies with the plans and relevant standards. The inspections and audits can be quite complex and often take some time to complete. Once all authorities have provided their approvals, Council will issue a Statement of Compliance (SoC).

0%
Phase 7

Titles and Settlements

Lodgement packages are prepared and finalised, individual titles for each lot are issued by the Titles Office. Your solicitor or finance broker is notified when this has occurred and will arrange for settlement. Once settlement has occurred, your land is ready to commence construction of your new home.

  • Ready For Titles
Tip: This is when the land will become available for inspections for valuations and builder assesment