Villawood Properties Facebook Facebook Instagram Twitter YouTube Linked In Linked In Email Phone Phone Next Scroll to move Touch to move edit edit Play Play Pause Volume Mute Zoom Search Map Map List Social New Application Document Request User Lot Area Frontage Depth Bedrooms Bathrooms Garage Price Range Download Location Location Filter Bedrooms Bathrooms Bathrooms Lot Size Stage Sales Sales Titled Lot Lot Club Access Visitors Virtual Tour Open Close

Construction Update

Lots 1105-1113

Building Permit Received
Site cuts forecast for October

13%
Overall Progress
Loading
95%
Phase 1

The Base Stage

The base stage prepares your block of land to be built on; it lays the foundation of your home. This involves levelling, excavating, and underground connections made such as plumbing, electrical, and stormwater systems. Once the concrete slab is poured, the base stage is complete.

  • October 2022
0%
Phase 2

The Frame Stage

The frame stage is all about forming the skeleton of your home. It starts with the marking and construction of the walls along with roof trusses, window and door frames. The frame stage is complete once approved by a qualified building survey.

0%
Phase 3

The Lock-up Stage

The lock-up stage is the locking up of your house. Focusing on external areas such as windows, temporary external doors, guttering, roof cover, brickwork and walls, it begins to shape the exterior of your home. Rough-ins occur at this same stage, where plumbing and electrical conduits are fixed for ducted air conditioning, vacuum systems, and security systems.

0%
Phase 4

Fixing Stage

This stage involves all the internal details being ‘fixed’ into your home. From wall plasters, ceilings, skirting boards, internal doors, stairs, kitchen and room cabinetry. The house’s wet areas will also be waterproofed at this stage. This stage is complete after an approval of the inspection.

0%
Phase 5

Fit-Off Stage

During fit-off, walls are painted and the final design features are installed - shelving, tiling, cabinetry, cornices, benchtops, tapware, mirrors, shower screens, garage door, among others. The final fit-off for ducted vacuum, electrical, plumbing, and security also takes place. Once the quality management inspection has been certified, this stage is complete.

  • Construction Images
0%
Phase 6

Practical Completion Inspection (PCI)

This is the stage you’ve been waiting for. With painting, installations, and detailing done, the house is ready for your inspection. The builder will walk you through all sections of the house, demonstrating all features and functions. Note any defects before signing the official PCI document as the builder will need to amend these before arranging a second inspection.
Once you’re happy with the results and the final payment is settled, prepare to move in after two weeks.

0%
Phase 7

The Handover

The handover marks the end of your home building journey. Collect your keys and celebrate this momentous event in your life!

Tip: This is when the land will become available for inspections for valuations and builder assesment